CREW COMPRESSION SOCKS
SIZE CHART
| SIZE | DESCRIPTION | S/M | L/XL | TOL |
|---|---|---|---|---|
| A | Welt Depth | 3.0 cm | 3.0 cm | 3.0 cm |
| B | Welt Width | 8.5 cm | 8.5 cm | 8.5 cm |
| C | Leg Length | 20.5 cm | 20.5 cm | 20.5 cm |
| D | Foot Length | 22.0 cm | 22.0 cm | 22.0 cm |
| E | Foot Width | 8.0 cm | 8.0 cm | 8.0 cm |
| F | EU Size | 36-42 | 42-48 | - |
| G | Calf Size | 30-42 cm | 40-48 cm | - |
FEATURES
✓ True graduated compression: firm at the ankle, easing up the calf
✓ Helps reduce swelling and heavy legs
✓ Cuff that holds without digging: nothing to rub away at night
✓ Made with Dryarn®: the Italian microfiber that stays dry and weighs almost nothing
✓ Developed with an elite physiotherapist, refined on thousands of legs at his clinic
WHEN TO WEAR THEM
Wear them for:
- Work days on your feet: shifts, retail, teaching, healthcare
- Flights and long drives, anything over 3 hours
- Travel days and city walking
- Desk days when your ankles swell by afternoon
- Any evening your legs feel heavier than you do
MADE WITH ITALIAN DRYARN®
Dryarn® is an Italian technical microfiber used in high-end sportswear. One of the lightest yarns in the world, it doesn't hold moisture and helps your skin stay at its own temperature. We build the compression into the knit itself, so the pressure holds wash after wash instead of stretching out like cheap pairs do.
60-DAY MONEY BACK GUARANTEE
Most people feel it in the first week. Take 60 days anyway. If your legs don't notice, email us and every dollar comes back. No forms, no arguing.
SHIPPING
Free shipping on orders over $70
REAL COMPRESSION, WE´RE SAVING LEGS.
report lighter legs at the end of the day*
noticed less swelling within the first 2 weeks*
forget they're wearing them by mid-morning*
Before
After
Before
After
BUILT FOR ALL-DAY WEAR AND LONG-TERM HEALTH
1
ON IN SECONDS, OFF WITHOUT A FIGHT.
Stretches easy, holds firm. No struggle, no dreading the morning.
2
COOL EVEN IN PEAK SUMMER HEAT
WeFiber wicks sweat and dumps heat. Dry feet, all day.
3
GRADUATED COMPRESSION THAT ACTUALLY WORKS
Firm at the ankle, easing up the calf. Keeps blood moving through long days on your feet.
CHOOSE YOUR FIT
KNEE HIGH SOCKS
20-30 mmHg
compression
$85.00
COMPRESSION
BREATHABLE
SUPPORT CIRCULATION
REDUCE SWELLING
MOISTURE WICKING
COMPRESSION SOCK
20-30 mmHg
compression
$71.00
COMPRESSION
BREATHABLE
SUPPORT CIRCULATION
REDUCE SWELLING
MOISTURE WICKING
⭑⭑⭑⭑⭑
OVER 20,000+ PAIRS SOLD
I work 12-hour hospital shifts on my feet all day, and my legs used to feel so heavy by the time I got home. A colleague suggested compression socks, so I tried these. Did not expect such a difference — my legs feel SO much better at the end of a shift. Now I have 4 pairs haha.
I'm a physio, so I spend all day telling patients to wear compression and then stand for eight hours in whatever socks were clean. These replaced my normal socks completely. The compression is light enough for everyday, not just long days, and that heavy-leg feeling by mid-afternoon is just gone. I've recommended them to half my patients, my mum, and basically anyone who stands for a living.
Wore these on a long-haul flight and WOW, huge difference. No swollen ankles, no tired legs. Never flying without them again.
I originally bought these for recovery but started wearing them around training as well. Really like the compression because you can definitely feel the support but they are not crazy tight.
🛡 60-DAY MONEY BACK GUARANTEE
OUR SOCKS ARE KNIT FROM ITALIAN DRYARN° FIBER.
A technical microfiber from Italy, used in high-end sportswear.
Lighter than the yarn in almost any sock you own, and it doesn't hold sweat.














